Wharf Modules

Marine & Port, Mining Industry


Cargo 4 Wharf mocules 54,00 x 19,50 mtr - 710 Tonnes each
From Sattahip, Thailand
To Geraldton, Australia
Details Under contract to Laing O'Rourke, NMT shipped 4 Wharf Modules and associated equipment from Sattahip, Thailand to Geraldton, Western Australia. At the time, the MV Svenja was one of the heaviest lift capacity vessels in the world of its purpose. The Project required significant consultation with all parties, authorities and contractors. Geraldton is a swell affected berth and the precision installation and timing required by our client, close discussions where held with the GPA, LOR, and the vessel owner in order for safe mooring during installation. The installation was estimated to be completed over 6 days and was finished in 5, safely and without event. The shipment comprised of heavy lifts up to 710 Tonnes, 54 metres long and 19.5 metres wide with installation direct to pile.