Details |
Transport and installation of Suzlon Windturbines at the Eolico Amayo Windpark in Nicaragua. The old turbines were dismantled and replaced by new turbines. For this project we used our transport equipment and Terex CC-2500 (500 tonnes) Crawler Crane together with a 100 tonnes Mobile Crane for assistance. |